Title:
BUILDUP AND REPLACEMENT OF NAVSTAR GLOBAL POSITIONING SYSTEM AND THE 18-SATELLITE CONSTELLATION
Author:
Kruh, Pierre
Affiliation:
THE AEROSPACE CORPORATION
Issue Date:
1981-10
Rights:
Copyright © International Foundation for Telemetering
Collection Information:
Proceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection.
Publisher:
International Foundation for Telemetering
Journal:
International Telemetering Conference Proceedings
Abstract:
Changes in the Navstar Global Positioning System (GPS) program in 1980 resulted in a reduction in the number of satellites from 24 to 18, and consequently led to a reconsideration of the original orbital configuration and a revision in the way buildup and replacement would be performed. During the buildup phase of the program, the Space Shuttle will be used, launching up to two Navstar satellites per mission on launches shared with other payloads and up to four satellites on dedicated launches. The original concept for the 24 satellite Navstar GPS constellation consisted of three orbit planes with eight uniformly distributed satellites per plane. In that configuration, all of the satellites on each Shuttle launch would be placed in only one plane. With the reduction from 24 to 18 satellites, it was determined that there were advantages to evaluating other constellations; rather than simply reducing the baseline three-plane, 24-satellite configuration to 18 satellites by removing two satellites from each plane, a larger number of planes may be preferred for the restructured program. Indeed, the current baseline configuration is a sixplane, 18-satellite constellation with three satellites per plane, and the three-plane constellation is an alternate configuration. Buildup and replacement studies for the new configurations that have been investigated have not only addressed the performance goals of Navstar GPS but have considered the economic use of the Shuttle as a launch platform. In addition, the launch constraints imposed by the Shuttle must be considered in the strategy used for buildup and replacement. This paper discusses the fundamentals of the buildup and replacement and the performance of the GPS with 18 satellites. The constellations discussed are the sixplane GPS baseline and the alternate three-plane configuration.
Sponsors:
International Foundation for Telemetering
ISSN:
0884-5123; 0074-9079
Additional Links:
http://www.telemetry.org/

Full metadata record

DC FieldValue Language
dc.language.isoen_USen
dc.titleBUILDUP AND REPLACEMENT OF NAVSTAR GLOBAL POSITIONING SYSTEM AND THE 18-SATELLITE CONSTELLATIONen_US
dc.contributor.authorKruh, Pierreen
dc.contributor.departmentTHE AEROSPACE CORPORATIONen
dc.date.issued1981-10-
dc.rightsCopyright © International Foundation for Telemeteringen
dc.description.collectioninformationProceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection.en
dc.publisherInternational Foundation for Telemeteringen
dc.description.abstractChanges in the Navstar Global Positioning System (GPS) program in 1980 resulted in a reduction in the number of satellites from 24 to 18, and consequently led to a reconsideration of the original orbital configuration and a revision in the way buildup and replacement would be performed. During the buildup phase of the program, the Space Shuttle will be used, launching up to two Navstar satellites per mission on launches shared with other payloads and up to four satellites on dedicated launches. The original concept for the 24 satellite Navstar GPS constellation consisted of three orbit planes with eight uniformly distributed satellites per plane. In that configuration, all of the satellites on each Shuttle launch would be placed in only one plane. With the reduction from 24 to 18 satellites, it was determined that there were advantages to evaluating other constellations; rather than simply reducing the baseline three-plane, 24-satellite configuration to 18 satellites by removing two satellites from each plane, a larger number of planes may be preferred for the restructured program. Indeed, the current baseline configuration is a sixplane, 18-satellite constellation with three satellites per plane, and the three-plane constellation is an alternate configuration. Buildup and replacement studies for the new configurations that have been investigated have not only addressed the performance goals of Navstar GPS but have considered the economic use of the Shuttle as a launch platform. In addition, the launch constraints imposed by the Shuttle must be considered in the strategy used for buildup and replacement. This paper discusses the fundamentals of the buildup and replacement and the performance of the GPS with 18 satellites. The constellations discussed are the sixplane GPS baseline and the alternate three-plane configuration.en
dc.description.sponsorshipInternational Foundation for Telemeteringen
dc.identifier.issn0884-5123-
dc.identifier.issn0074-9079-
dc.identifier.urihttp://hdl.handle.net/10150/615419-
dc.identifier.journalInternational Telemetering Conference Proceedingsen
dc.typetexten
dc.typeProceedingsen
dc.relation.urlhttp://www.telemetry.org/en
All Items in UA Campus Repository are protected by copyright, with all rights reserved, unless otherwise indicated.