Persistent Link:
http://hdl.handle.net/10150/613753
Title:
PLANNING THE AFSCF OF THE FUTURE
Author:
Carroll, James T.
Affiliation:
The Aerospace Corporation
Issue Date:
1981-10
Rights:
Copyright © International Foundation for Telemetering
Collection Information:
Proceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection.
Publisher:
International Foundation for Telemetering
Journal:
International Telemetering Conference Proceedings
Abstract:
This presentation describes the Air Force Satellite Control Facility (AFSCF) planning cycle by use of decision package sets that will be incorporated in the DoD portion of the President’s budget. Major AFSCF projects reviewed include Data System Modernization; Remote Tracking Station (RTS) Modernization; Shuttle Support; Advanced Telemetry, Tracking, and Command; Transportable RTS; and the NASA Tracking Data Relay Satellite (TDRSS) interface with the AFSCF. Zero based budgeting using decision packages determine project priorities and approval levels. The benefit and task description of AFSCF major projects is described for the years 1983 through 1987. Long range priorities through the year 2000 are summarized.
Sponsors:
International Foundation for Telemetering
ISSN:
0884-5123; 0074-9079
Additional Links:
http://www.telemetry.org/

Full metadata record

DC FieldValue Language
dc.language.isoen_USen
dc.titlePLANNING THE AFSCF OF THE FUTUREen_US
dc.contributor.authorCarroll, James T.en
dc.contributor.departmentThe Aerospace Corporationen
dc.date.issued1981-10-
dc.rightsCopyright © International Foundation for Telemeteringen
dc.description.collectioninformationProceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection.en
dc.publisherInternational Foundation for Telemeteringen
dc.description.abstractThis presentation describes the Air Force Satellite Control Facility (AFSCF) planning cycle by use of decision package sets that will be incorporated in the DoD portion of the President’s budget. Major AFSCF projects reviewed include Data System Modernization; Remote Tracking Station (RTS) Modernization; Shuttle Support; Advanced Telemetry, Tracking, and Command; Transportable RTS; and the NASA Tracking Data Relay Satellite (TDRSS) interface with the AFSCF. Zero based budgeting using decision packages determine project priorities and approval levels. The benefit and task description of AFSCF major projects is described for the years 1983 through 1987. Long range priorities through the year 2000 are summarized.en
dc.description.sponsorshipInternational Foundation for Telemeteringen
dc.identifier.issn0884-5123-
dc.identifier.issn0074-9079-
dc.identifier.urihttp://hdl.handle.net/10150/613753-
dc.identifier.journalInternational Telemetering Conference Proceedingsen
dc.typetexten
dc.typeProceedingsen
dc.relation.urlhttp://www.telemetry.org/en
All Items in UA Campus Repository are protected by copyright, with all rights reserved, unless otherwise indicated.